Skip to product information
1 of 6

Graywind Smart Roman Shades Compatible with Alexa Google Rechargeable Motorized Blinds with Remote Blackout Roman Window Shades Plain Fold Soft for Doors Bedroom, Custom Size (Flowline Midnight)

Graywind Smart Roman Shades Compatible with Alexa Google Rechargeable Motorized Blinds with Remote Blackout Roman Window Shades Plain Fold Soft for Doors Bedroom, Custom Size (Flowline Midnight)

Quantity
Regular price $304.00
Regular price Sale price $304.00
Sale Sold out
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

About This

  • Functional shades: 100% blackout fabric, classic plain fold roman shades with soft fabric, neat stack when raised. Roman window shades offers a classic and modern update to your home decor. Privacy & room darkening offered, ideal indoor window treatments for bedroom, living room, french doors etc. Cordless style, safe for children and pets. Rohs certificated and eco-friendly.
  • 15-channel timing remote: Able to seperately & group control maximum 15 smart shades. It provides favorite position as well (the basic program of remote will be set before shipment). 20 date-time groups available, add any electric curtains to any schedules to achieve automatic timing control as preference. Support handheld or wall-mounted.
  • Bluetooth motor solutions: Called ble motor for short. Work directly with graywind app via bluetooth within range of singal (about 99ft/30m), no smart bridge needed. Easy to pencentage control, set top/bottom and favorite limit positions on app. Also, battery status display is available. Recommended for users who only need to control smart blinds via remote controller or app at home. 2.4ghz ble hub is available for create groups, set timing shedules or other routines and alexa & google control.
  • Zigbee motor solution: Work with echo plus 2nd gen./ echo show 2nd gen./ echo studio/ echo show 10 3rd gen./ echo 4th gen. directly, no hub required. Realize smart control via not only the app anywhere, but also voice command, such as group and percentage control etc. 2.4ghz zigbee hub is available to connect with other alexa models & google.
  • Made to order: Click "customize now", custom dimensions and details. Please check Amazon reconfirmation messages within 24 hours, order will proceed if we don't get reply in 48 hours.
  • After service: Graywind smart blinds are designed for easier installation, manuals and video guide available. We provide long-term technical support.

Overview

  • Material : 1 - Rechargeable Smart Motor
  • Product Dimensions : 120"L x 99"W
  • Brand : Graywind
  • Color : Blackout - Flowline Midnight
  • Opacity : Blackout
View full details
Safer Living, Smarter Convenience
Fast U.S. Delivery
Free shipping on orders over $99
Easy Returns
Shop with confidence
Secure Payment
Protected and secure checkout
Customer Support
Helpful support when you need it

WE MAKE SMART LIVING SIMPLE.

OUR TEAM HELPS SECURE YOUR HOME.

history_edu   ━━ about us

SmartHomeValueHub helps homeowners create safer, smarter, and more convenient living spaces with trusted smart home solutions built for everyday life.

From smart security cameras and smart locks to video doorbells, thermostats, lighting, and home automation essentials — we focus on products that improve real comfort, safety, and efficiency.

Our goal is simple: better protection, lower energy costs, and smarter daily living for every home.

Smart Door Locks
1000+ SMART HOME EXPERIENCE
Smart Security Cameras
25k+ HAPPY HOMEOWNERS TRUST US
Control Your Home Smarter, Safer, and More Efficiently
Security Cameras
Smart Door Locks
 Thermostats

Why Homeowners Trust SmartHomeValueHub

help_outline   ━━ Why us?

✔ Easy Setup


✔ Matter Compatible


✔ Smart Security


✔ Energy Saving

50K

HaSMART DEVICES INSTALLEDppy Clients

15+

YEARS OF SMART HOME EXPERTISE

98%

CUSTOMER SATISFACTION RATE

365 

RELIABLE SUPPORT YEAR-ROUND

Our Trusted Partners

Smarter Security. Lower Bills. Easier Living.

compare   ━━ before & after
Make your home safer, more efficient, and easier to manage with smart solutions built for everyday life. Discover practical upgrades for security, energy savings, and connected convenience.
Home Security 93 %
Lower Energy Bills 89 %
Easier Daily Living 98 %
Video Doorbells
Robot Vacuums
Smart Lighting

SMART HOME FAQ

How to choose a spare part by wine number?
remove
add
A smart home system connects devices like cameras, locks, lights, thermostats, and sensors so you can control, automate, and monitor your home from anywhere..
Do smart home devices work with Alexa, Google Home, and Apple HomeKit?
remove
add

Yes — many modern devices support multiple platforms.

Matter-certified devices can work across Alexa, Google Home, and Apple HomeKit at the same time.

Is professional installation required?
remove
add

Not always.

Smart bulbs, plugs, cameras, and video doorbells are often easy DIY installations, while full security systems may need professional setup.

Will smart home devices still work if the internet goes down?
remove
add

Many devices still work manually or through local control.

You may lose remote app access, but locks, lights, and thermostats often continue basic functions.

Are smart home devices secure from hacking?
remove
add

Security depends on the device and setup.

Use strong passwords, trusted brands, firmware updates, and secure Wi-Fi for better protection. Privacy and unauthorized access are common concerns in smart homes.

Which smart home devices should I buy first?
remove
add

Most homeowners start with:

Smart Security Cameras

Smart Door Locks

Smart Thermostats

Smart Plugs

Video Doorbells

Can smart home devices help lower energy bills?
remove
add

Yes.

Smart thermostats and smart plugs help reduce wasted energy by automating heating, cooling, and power usage.

What is Matter and why does it matter?
remove
add
Matter is a new smart home standard that improves compatibility between brands and platforms.It makes setup easier and helps devices work together more smoothly.
Which smart home platform is best?
remove
add

It depends on your ecosystem.

Alexa → widest compatibility

Google Home → strong for Android users

Apple HomeKit → best privacy

Home Assistant → advanced control

Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now